PROJECT SUMMARY:
Utility Network Implementation for Water System
San Bernardino Municipal Water Department (SBMWD)

The pilot had treatment facilities, and some asset types were added to the water asset package to accommodate these features. The data was then migrated to the Utility Network. The data was configured with elements such as assemblies, containers, and subnetworks. The directionality of flow was set at pump stations and pressure relief valves. DCSE then resolved the topology errors to develop a traceable utility network.
Finally, the Utility Network was published to the ArcGIS Enterprise with branch versioning enabled. DCSE also set up web apps to trace and edit the data on the web.
Following the pilot study, DCSE is assisting SBMWD with migrating the complete system, and deploying the enterprise to a cloud environment.
HIGHLIGHTS
- Utility Network
- Cloud Environment
- Configuration
- Water Systems
- 3D Visualization
- Advanced Tracing
- Data Migration
- ArcGIS Pro
- Web Maps & Apps
BENEFITS
- Utility Network Pilot Study
- Intelligent Network
- Linear & Vertical Assets
- Multi-level network representation in 2D & 3D
- Efficient data management
- Accurate & efficient tracing capability
- Quick information delivery with large datasets
PROJECT OWNER
- San Bernardino Municipal Water Department (SBMWD)
REQUEST MORE INFORMATION
LOCATION
DCSE Inc.
23461 S. Pointe Drive
Suite 300
Laguna Hills, CA 92653
© 2024 DCSE Inc. All Rights Reserved